Most serious thermal failures begin as slow drift that was logged but not acted on, and end when a single cooling component fails during peak load
In November 2025 a cooling failure at CyrusOne's data center in Aurora, Illinois halted CME Group's futures markets for about 10 hours. In January 2025 the Moss Landing battery building in California, a Vistra facility using LG Energy Solution NMC cells, burned for days after thermal runaway. Both fit the pattern: a cooling or containment path with too little margin, then one failure that the remaining equipment could not cover.
The catalog below is ordered by how often each mode appears. Derating and hotspots are daily events at dense sites; trips and runaway are rare but expensive. The common defenses are design for the degraded state - one unit out, a fouled exchanger, reduced water, at peak ambient - instrumentation by zone or branch rather than plant totals, and hysteresis with minimum run times at mode transitions, where control loops most often oscillate.
Battery sites have moved the most: since Moss Landing, the industry has shifted from large buildings of NMC racks to outdoor LFP containers with liquid cooling, gas detection and spacing tested to UL 9540A and NFPA 855.
Catalog
Failure mode catalog
| Mode | Symptom | Root causes | Early warning | Mitigation |
|---|---|---|---|---|
| Derating | Power rollback; throughput drops | Too little rejection capacity; hot ambient; fouled exchanger | Rising delta-T and approach; more fan and pump duty | Headroom; hybrid rejection; cleaning plan; buffering |
| Hotspots | Single-component overtemperature | Concentrated heat flux; manifold imbalance; connector resistance | Thermal imaging; branch delta-T divergence | Cooling at the source; rebalance flow; liquid-cooled cables |
| BESS thermal runaway | Cell alarms; shutdown; fire | Non-uniform cooling; HVAC failure; cell defects | Widening cell temperature spread; off-gas sensors | Zoning; detection; propagation barriers; LFP; spacing |
| Control instability | Temperature hunting; mode-switch faults | Poor tuning; sensor latency; setpoint conflicts | Rapid valve and fan cycling; overshoot | Commissioning; hysteresis; time-synced telemetry |
| Water chemistry drift | Scaling, corrosion, capacity loss | Underdesigned treatment; poor monitoring | Conductivity drift; rising pressure drop | Instrumented treatment; preventive maintenance |
| Fouling and clogging | Lower flow; higher pump power | Dirty strainers; biofouling; scaling | Pressure drop and pump power rise | Filtration; differential-pressure alarms; cleaning |
| Leak or contamination | Coolant loss; downtime | Material incompatibility; poor joints; vibration | Makeup water rise; pressure decay | Leak detection; isolation zones; pressure testing |
| Chiller or compressor trip | Sudden capacity loss | Condenser fouling; low flow; refrigerant faults | High condenser pressure; short cycling | N+1 chillers; staged controls; power conditioning |
| Fan or pump single point | Zone temperature excursion | No redundancy or spares | Vibration, bearing temperature, current | N+1; quick-swap spares; predictive maintenance |
| Heat sink mismatch | Works in test, fails on hot days | Designed to average ambient; ignored wet-bulb | Derates correlate with weather extremes | Design to extremes and degraded states |
By site
Failures by deployment
| Deployment | Most common failures | Impact | High-leverage fixes |
|---|---|---|---|
| AI data centers | Hotspots, throttling, coolant distribution | Idle GPUs; SLA risk | Direct-to-chip; telemetry; stable transitions |
| Fleet DCFC and MCS depots | Charger rollback, connector overheating | Missed dispatch windows | Liquid-cooled cables; load scheduling |
| BESS sites | Uneven cooling, HVAC failure | Lost capacity; safety derates | Zoning; redundancy; conservative envelopes |
| Semiconductor fabs | Chilled-water excursions | Yield loss; tool downtime | Redundant plants; predictive maintenance |
| Gigafactories | Dry-room excursions, process heat overload | Throughput caps; quality drift | Zoned plants; buffering |
Telemetry
Minimum telemetry
| Signal | What to log | Automation |
|---|---|---|
| Derate events | Time, ambient, load, zone, duration | Alert when weekly trend rises |
| Delta-T per zone | Supply and return by branch; flow | Flag divergence beyond threshold |
| Approach temperature | Wet-bulb or dry-bulb vs reject temperature | Trigger mode change or pre-cooling |
| Pump and fan power | kW, duty, starts and stops | Flag abnormal duty for inspection |
| Water chemistry | Conductivity, pH, biocide, blowdown | Hard alarms on drift, soft on trend |
| Mode transitions | Economizer-to-chiller switches, staging | Enforce hysteresis and minimum run time |