Building generation is no longer the slow part. Connecting it is.
US developers plan a record 86 GW of utility-scale capacity for 2026 (EIA), and 93% of it is solar, batteries and wind. Those plants take one to two years to build. Getting permission to connect them now takes about five: the median project built in 2025 waited 61 months from interconnection request to operation, against 22 months in 2008 (LBNL).
Behind the queue sits the equipment. Power transformers average about 128 weeks to deliver, the US imports about 80% of them, and Wood Mackenzie put the 2025 shortfall at 30%. Every new load in this hub - a gigafactory, a fab, a data center, a truck depot - waits on the same substations and the same transformer factories.
That is why the fastest-growing assets are the ones that work around the grid: batteries that shrink a site's peak demand, microgrids that run a campus on its own generation, and software that schedules charging and storage against grid limits.
The Energy hub
Twelve pages in three groups
Grid, generation, and storage and control. Each row gives the page's lead finding.
| Group | Page | Covers | Finding |
|---|---|---|---|
| Grid | Grid and Upgrades | Transmission, distribution, substations, transformers | Transformers are the binding constraint: ~128-week lead times, 80% imported |
| Grid | HVDC and MVDC | DC corridors, offshore links, DC distribution | Converter stations and cable are booked years out |
| Grid | Solid-State Transformers | SiC power electronics in place of iron-core transformers | First commercial units; a way around GOES and transformer queues |
| Grid | Grid Edge and DER | Rooftop solar, home batteries, EVs, V2G, flexible load | The edge now adds capacity faster than the bulk grid |
| Generation | Solar Energy | Utility, rooftop and depot solar | 51% of planned US additions for 2026 |
| Generation | Wind Power | Onshore and offshore wind, US wind farms | 14% of planned 2026 additions; offshore stalled by policy |
| Generation | Nuclear Power | Large reactors, restarts, SMRs | No new US capacity planned for 2026; demand from data centers |
| Generation | Natural Gas | Turbines, peakers, on-site gas | Gas in queues up 86% in 2025; turbines sold out for years |
| Storage and control | Battery Energy Storage | Utility, commercial and residential storage | 28% of planned 2026 additions; Texas is 53% of it |
| Storage and control | Notable BESS Deployments | The largest storage plants | Placeholder: largest operating sites |
| Storage and control | Microgrids | Campus, depot and industrial microgrids | On-site power to skip the queue |
| Storage and control | Energy Orchestration | Software that schedules generation, storage and load | Turns batteries and chargers into grid capacity |
New loads
What the grid is being asked to serve
The largest new loads are campuses that each need their own substation.
| Load | Typical demand | Outage sensitivity |
|---|---|---|
| Battery and EV gigafactories | 50-150+ MW per campus | High: lost batches, costly restarts |
| Semiconductor fabs | 50-300+ MW per campus | Very high: yield loss, tool damage |
| AI data centers | 100-500+ MW per campus; 1-5 GW clusters | High to very high: stranded compute |
| Fleet charging depots | 1-20 MW per site; MCS up to ~3.75 MW per connector | Moderate: missed dispatch windows |
| Industrial process electrification | 100-400 MW for large process plants | Varies by process |
Sources
Sources and scope
- Scope
- Grid, generation, storage and control pages; new loads folded in from the former Energy Foundation page
- Sources
- EIA Preliminary Monthly Electric Generator Inventory (February 2026); LBNL Queued Up 2026; Wood Mackenzie transformer survey
- Updated
- October 2026