Finding
Homes and businesses already hold a power plant's worth of flexible capacity; the rules decide how much of it counts
Virtual power plants - aggregated home batteries, thermostats, EV chargers, water heaters and commercial loads - reached 37.5 GW in North America in 2025 (Wood Mackenzie), close to the 45 GW of utility-scale batteries the US had built. Deployments grew 33% in a year, but capacity grew only 13.7%.
The gap is regulatory, not technical. Utility program caps, capacity accreditation rules and limited wholesale market access keep enrolled devices from counting at full value; most aggregators say FERC Order 2222 has done little to open markets. Texas and the PJM region, where data centers are adding the most load, also have the largest VPP contracts, because flexible demand is the fastest capacity a utility can add.
The edge also changes the distribution grid. Rooftop solar, home batteries and EV chargers push power both ways on feeders built for one-way flow, so utilities need smart inverters, DER management systems and, increasingly, solid-state equipment at the feeder.
The assets
What sits at the grid edge
| Asset | Role | Notes |
|---|---|---|
| Rooftop and commercial solar | Generation behind the meter | Smart inverters set voltage and ride-through behavior |
| Home and commercial batteries | Peak shaving, backup, VPP dispatch | Largest share of dispatchable VPP capacity |
| EV chargers and V2X | Flexible load; bidirectional where supported | Managed charging today; V2G still small |
| Thermostats and water heaters | Shift load minutes to hours | Cheapest flexible capacity per kW |
| Commercial and industrial loads | Demand response contracts | Data centers now offering curtailment |
| Microgrids | Island and run a site on its own | See Microgrids |
The control stack
From device to market
| Layer | What it does | Standards and players |
|---|---|---|
| Device | Inverters, batteries, chargers, meters | IEEE 1547-2018 for interconnection; UL 1741 SB |
| Communication | Device-to-aggregator protocols | IEEE 2030.5, OpenADR, OCPP for chargers |
| Aggregation | VPP platforms bundle devices into dispatchable blocks | Tesla, Sunrun, Renew Home, Uplight, CPower, EnergyHub |
| Utility control | DERMS and ADMS see and steer the feeder | Schneider, GE Vernova, Oracle, Siemens |
| Market | Wholesale and utility programs pay for capacity | FERC Order 2222; ERCOT ADER; California DSGS |
Sources
Sources and scope
- Scope
- Distributed energy resources, virtual power plants and grid-edge control