EV Supply Chain > Gigafactories > Battery Gigafactories > Huawei-Seres Chongqing AITO EV Plant


Huawei-Seres Chongqing AITO EV Plant


[Last updated: Apr 2026]

This battery pack/module gigafactory is part of the advanced manufacturing and industrial electrification ecosystem.

OEM/owner: Huawei-Seres
Facility: Chongqing AITO EV Plant
Location: Chongqing Chongqing
Country: China
Tier level: 1
Capacity: GWh
Cell chemistry: NMC / LFP (EREV)
Status: Operational
Opened: 2022
Investment: $0.80B USD
Anchor customer: AITO (Huawei DriveONE platform)
Other customer: Seres manufacturing partner
Geo risk: HIGH


Supply chain notes:
Huawei DriveONE EREV platform; AITO M5/M7/M9; Chongqing; Seres manufacturing; Huawei full-stack EV (motor+inverter+OBC+software); 250k units..

Semiconductor relevant notes:
Huawei DriveONE SiC inverter + motor + OBC integration; CATL EREV cell.


Location map - Driving directions




EV battery cell gigafactories are large-scale industrial production facilities that include cell manufacturing, automation, and high-throughput logistics. These facilities impose significant electrical load, thermal management, and site electrification requirements, and serve as anchor nodes within regional supply chains and energy infrastructure.


Related supply chain and infrastructure