EV Supply Chain > Gigafactories > Battery Gigafactories > Hyundai Nosovice Plant
Hyundai Nosovice Plant
[Last updated: Apr 2026]
This battery pack/module gigafactory is part of the advanced manufacturing and industrial electrification ecosystem.
| OEM/owner: | Hyundai |
| Facility: | Nosovice Plant |
| Location: | Nosovice Moravian-Silesian |
| Country: | Czech Republic |
| Tier level: | 2 |
| Capacity: | GWh |
| Cell chemistry: | NMC |
| Status: | Operational |
| Opened: | 2023 |
| Investment: | $0.50B USD |
| Anchor customer: | Hyundai |
| Other customer: | Kia | Geo risk: | LOW |
Supply chain notes:
Hyundai Nosovice Czech; Hyundai Ioniq 5 and Kia EV6 European production; 300k units; SK On Hungary cell supply; EU local content compliance..
Semiconductor relevant notes:
Hyundai E-GMP 800V SiC traction; SK On Hungary cell supply chain.
Location map - Driving directions
EV battery cell gigafactories are large-scale industrial production facilities that include cell manufacturing, automation, and high-throughput logistics. These facilities impose significant electrical load, thermal management, and site electrification requirements, and serve as anchor nodes within regional supply chains and energy infrastructure.