Charging
Charging: CCS1 DC; Xos Hub mobile charging
Autonomy: Driver assistance (emergency braking, lane-keep warning). Software: Xos Fleet Command telematics; Xos Hub mobile charger.
Configurations: Walk-in step van on the Xos X-Platform chassis; modular packs; Utilimaster and other bodies.
Primary use: Parcel and linen delivery (UPS, FedEx contractors, Cintas).
Vehicle record
Vehicle record
| Make | Xos |
| Class | van |
| Type | step van |
| Weight class | Class 5-6 (N2) |
| Country | United States |
| Powertrain | battery-electric |
| Charging | CCS1 DC; Xos Hub mobile charging |
| Configurations | Walk-in step van on the Xos X-Platform chassis; modular packs; Utilimaster and other bodies |
| Dual-use | no |
| Autonomy | Driver assistance (emergency braking, lane-keep warning) |
| Software | Xos Fleet Command telematics; Xos Hub mobile charger |
| Primary use | Parcel and linen delivery (UPS, FedEx contractors, Cintas) |
| Status | in production |
| Record updated | 2026-10 |
Official site: xostrucks.com
In context
Where it fits
Listed in Electric Vans. Commercial vehicles are compared on battery and range against the duty cycle, how they charge at the depot or on the corridor, the configurations each platform is sold in, autonomy and fleet software, and whether a consumer version shares the platform.
| Model | Type | Status |
|---|---|---|
| Medium-duty stripped chassis (Harbinger) | step van | in production |
| W56 (Workhorse) | step van | in production |
| MT50e (Freightliner Custom Chassis) | step van | unconfirmed |
| W750 (Workhorse) | step van | unconfirmed |
| Class 4-5 EV step van (Blue Arc (Shyft Group)) | step van | discontinued |
| P7-C (REE Automotive) | step van | discontinued |
| LDV (Canoo) | step van | closed |
| ETP3 (T3) (BYD) | cargo van | in production |
Sources
Sources and scope
- Scope
- SV (Stepvan) (Xos)
- Sources
- ElectronsX commercial and municipal dataset; manufacturer specifications and releases
- Updated
- 2026-10