Multi-Fleet Depots

coincident peak · charge points · BESS · priority

Vehicles set a mixed depot's power peak; robots and drones set its charge-point count. The battery is sized to the hours when the peaks overlap.

Two bar charts for an illustrative mixed depot of 100 robotaxis, 40 delivery vans, 200 humanoid robots and 30 drones, with 300 charge points and 6.8 MW of connected charging. Share of connected charging power: robotaxis 66%, vans 29%, humanoids 3%, drones 1%. Share of charge points: robotaxis 10%, vans 13%, humanoids 67%, drones 10%. SHARE OF CONNECTED CHARGING POWER Robotaxis 66% Vans 29% Humanoids 3% Drones 1% SHARE OF CHARGE POINTS Robotaxis 10% Vans 13% Humanoids 67% Drones 10% Illustrative depot: 100 robotaxis, 40 vans, 200 humanoids, 30 drones;300 charge points and 6.8 MW of connected charging.
Robotaxi share of power
66%
Robot share of points
67%
Peak to average
~9x
Battery buffer
~3 MWh
Hub
Charging

Finding

In a mixed depot, robotaxis and trucks set the power peak, robots and drones set the number of charge points, and the battery is sized to the overlap, not to daily energy

In an illustrative depot with 100 robotaxis, 40 vans, 200 humanoids and 30 drones, the robotaxis hold two-thirds of the 6.8 MW of connected charging but only a tenth of the 300 charge points; the humanoids hold two-thirds of the points and 3% of the power. The site uses about 10 MWh a day, an average of 0.43 MW, but the evening robotaxi return on top of vans starting their overnight charge peaks near 4 MW.

A 2.5 MW utility service with a battery of about 1.5 MW and 3 MWh covers that two-hour overlap; sizing the service to the peak instead would mean a larger transformer and a longer interconnection queue for capacity used a few hours a day. The same arithmetic explains why humanoid and drone docks hardly move the electrical design but dominate the floor plan, cabling and network ports: 230 small connections that each need a dock, a data link and a slot in the scheduler.

Factories already run this way. Giga Texas charges employee cars, Semi trucks and yard tractors, runs autonomous mobile robots and forklifts, and is training Optimus humanoids on one campus - see the AustinIO page on Tesla Giga Texas. BYD and CATL campuses in China mix electric buses, logistics trucks and AGVs the same way. The operating side of a shared yard - staging, dispatch and maintenance - is covered on Energy Autonomy Yards.

Worked example

Sizing an illustrative mixed depot

ElectronsX illustrative calculation; assumptions in the rows.

Illustrative mixed depot
AssetFleetCharge pointsConnected powerDaily energyEvening peak load
Robotaxis100 at ~50 kWh/day30 DC at 150 kW4.5 MW5.0 MWh3.0 MW (20 stalls busy)
Delivery vans40 at ~80 kWh/day40 DC at 50 kW2.0 MW3.2 MWh0.8 MW (managed)
Humanoids200 at ~7 kWh/day200 docks at 1 kW0.2 MW1.4 MWh0.15 MW
Drones30 at ~20 kWh/day30 pads at 3 kW0.09 MW0.6 MWh0.05 MW
Site370 assets3006.8 MW10.2 MWh (0.43 MW average)~4.0 MW against a 2.5 MW service

Power envelope

Power envelope by asset class

Charging envelope by asset class
AssetBatteryCharging powerPatternScheduling priority
Fleet EVs and vans60-120 kWh (vans); 400-900 kWh (trucks)19 kW AC to 350 kW DC; 1 MW+ for trucksOvernight or between shiftsFlexible within the dwell window
Robotaxis50-100 kWh150-350 kW DC, or inductive padsShort top-ups across long service hoursHigh: idle vehicles lose revenue
Humanoid robotsAbout 1-3 kWh0.5-5 kW docksFrequent dock returnsLow per unit, but hundreds of units
Drones0.1-2 kWh0.5-10 kW pads, or battery swapBursts tied to missionsMission-timed; swap avoids waiting

Battery roles

What the depot battery does

Size it to coincident power and peak duration, then check that it still covers critical loads in an outage.

Depot battery functions
FunctionRoleWhy it matters
Peak shavingCovers overlapping charging eventsSmaller utility service and lower demand charges
Load shiftingStores cheap or solar energy for laterLower energy cost; matches charging to tariff windows
Power qualityBuffers fast load rampsStable voltage with many chargers switching
ResilienceKeeps priority assets charging in an outageContinuity for autonomous and emergency fleets

Sources

Sources and scope

Scope
Multi-Fleet Depots
Sources
ElectronsX illustrative calculation; manufacturer battery specifications
Updated
October 2026