Status
Operational: Pilot recycling plant opened 2021
Process: mechanical. Capacity: 1,500 t/yr (Pilot capacity (Volkswagen, 2021)).
VW second-life at Salzgitter; co-located with PowerCo gigafactory; ID.4 and e-Golf pack refurbishment into stationary storage; EU Battery Regulation second-life traceability compliance.
Customers and offtakers: Grid operators / fleet operators.
Plant record
Plant record
| Company | Volkswagen Group Components |
| Plant | Salzgitter Recycling Pilot Plant |
| City | Salzgitter |
| State or province | Lower Saxony |
| Country | Germany |
| Type | Recycler |
| Process | mechanical |
| Output stage | black mass |
| Input chemistries | NMC (ID.4 / e-Golf packs) |
| Output products | Black mass |
| Capacity (t/yr input) | 1500 |
| Capacity basis | Pilot capacity (Volkswagen, 2021) |
| Status | operational |
| Status note | Pilot recycling plant opened 2021; legacy record called it second life |
| Scale | pilot |
| Start year | 2021 |
| Investment (US$ billion) | 0.1 |
| Customers and offtakers | Grid operators / fleet operators |
| OEM partnerships | VW Group (captive) |
| Under EU Battery Regulation | Yes |
| Geopolitical exposure | LOW |
| Record updated | 2026-10 |
In context
Where it fits
Listed in EV Battery Recycling Facilities; owner profile: Volkswagen Group. Recyclers are compared on where they stop: shredding to black mass, smelting to alloy, or refining to battery-grade salts that go back into cathode plants; only refining keeps the metal in the region. See Battery Recycling for the process and the market.
| Plant | Country | Status |
|---|---|---|
| Krefeld Plant (Accurec Recycling) | Germany | operational |
| Schwarzheide Black Mass Plant (BASF) | Germany | operational |
| Leipzig Battery Refurbishment (BMW Second Life) | Germany | operational |
| Magdeburg Spoke (Glencore (formerly Li-Cycle)) | Germany | operational |
| Hilchenbach Plant (Primobius (SMS group and Neometals)) | Germany | operational |
| Multiple EU Sites (REMONDIS Battery Recycling) | Germany | operational |
| Dormagen Plant (Cylib) | Germany | under construction |
Sources
Sources and scope
- Scope
- Salzgitter Recycling Pilot Plant (Volkswagen Group Components)
- Sources
- ElectronsX recycling dataset; company disclosures
- Updated
- 2026-10