Charging
Charging: GB/T, CCS2 or CCS1 by market
Autonomy: not published. Software: BYD fleet telematics.
Configurations: 12 m (40 ft); LFP Blade cells; built in China, Hungary (Komárom), Lancaster (California) and partner plants.
Primary use: City transit in China, Europe, Latin America, Asia; excluded from US FTA funding.
Vehicle record
Vehicle record
| Make | BYD |
| Class | bus |
| Type | transit bus |
| Weight class | Class 8 (M3) |
| Country | China |
| Powertrain | battery-electric |
| Charging | GB/T, CCS2 or CCS1 by market |
| Configurations | 12 m (40 ft); LFP Blade cells; built in China, Hungary (Komárom), Lancaster (California) and partner plants |
| Dual-use | no |
| Software | BYD fleet telematics |
| Primary use | City transit in China, Europe, Latin America, Asia; excluded from US FTA funding |
| Status | in production |
| Record updated | 2026-10 |
Official site: byd.com
In context
Where it fits
Listed in Electric City Transit Buses. Commercial vehicles are compared on battery and range against the duty cycle, how they charge at the depot or on the corridor, the configurations each platform is sold in, autonomy and fleet software, and whether a consumer version shares the platform.
| Model | Type | Status |
|---|---|---|
| Enviro100EV (Alexander Dennis) | transit bus | in production |
| e.City Gold (Caetano) | transit bus | in production |
| 2.2 (Ebusco) | transit bus | in production |
| 3.0 (Ebusco) | transit bus | in production |
| BJ6123 EV (Foton) | transit bus | in production |
| Low Floor Battery Electric (Gillig) | transit bus | in production |
| XML6125J EV (Golden Dragon) | transit bus | in production |
| GX ELEC (Heuliez) | transit bus | in production |
Sources
Sources and scope
- Scope
- K9 (eBus 12 m) (BYD)
- Sources
- ElectronsX commercial and municipal dataset; manufacturer specifications and releases
- Updated
- 2026-10