EV Supply Chain > Gigafactories > Battery Cell Gigafactories > Ford-SK On BlueOval Stanton KY


Ford-SK On BlueOval Stanton KY


[Last updated: Apr 2026]

This battery cell gigafactory is part of the advanced manufacturing and industrial electrification ecosystem.

OEM/owner: Ford-SK On
Facility: BlueOval Stanton KY
Location: Stanton Kentucky
Country: USA
Tier level: 1
Capacity: 43 GWh
Cell chemistry: NMC
Format: Pouch Cells
Other product: Battery
Status: Operational
Opened: 2024
Investment: $6.00B USD
Anchor customer: Ford
Other customer:
Geo risk: LOW


Supply chain notes:
BlueOval SK JV Plant 2; Stanton KY co-located with Ford truck assembly; 43 GWh; Ford truck electrification anchor..

Semiconductor relevant notes:
Ford truck EV SiC demand; large-format pouch NMC.


Location map - Driving directions




EV battery cell gigafactories are large-scale industrial production facilities that include cell manufacturing, automation, and high-throughput logistics. These facilities impose significant electrical load, thermal management, and site electrification requirements, and serve as anchor nodes within regional supply chains and energy infrastructure.


Related supply chain and infrastructure