Finding
US depots are shifting to developers that own the land, power and chargers and sell charging as a service, while China's depots are built by grid companies and charging operators
Terawatt, which owns its real estate, grid connections, chargers and software and serves autonomous and commercial fleets, closed a debt facility of up to $300 million in June 2026. Voltera, WattEV, Forum Mobility at the Port of Long Beach and Greenlane - the Daimler Truck North America, NextEra Energy Resources and BlackRock venture - follow the same model. In China, State Grid, China Southern Grid, TELD and Star Charge build and run depots, and CATL's Qiji Energy builds battery-swap stations for heavy trucks.
Charging as a service moves the capital cost and the utility work off the fleet's balance sheet in exchange for a long-term per-kWh or per-stall contract. Large owner-operators - Amazon, UPS, FedEx, transit agencies and school-bus contractors - still build their own depots with a hired EPC, often using utility make-ready programs that pay for the service up to the charger. Either way, the schedule is set by the medium-voltage service, transformer and switchgear, so the EPC with substation experience matters more than the charger brand. Greenlane's I-45 truck lanes in Dallas and Houston are covered on the AustinIO page on Texas EV charging infrastructure.
The supplier base has consolidated. Siemens bought Heliox in 2024, Exicom bought Tritium the same year, Schneider Electric owns EV Connect, and Oshkosh owns the former JBT AeroTech airport equipment business. Powin filed for Chapter 11 in 2025 and FlexGen acquired its assets, a reminder to check the balance sheet of any integrator promising a 20-year service contract.
Roles
Who does what
| Role | Delivers | US and Europe | China |
|---|---|---|---|
| Developer and owner | Site, power, chargers, long-term operation | Terawatt, Voltera, WattEV, Forum Mobility, Greenlane, Zeem, EV Realty, bp pulse, Milence (Europe) | State Grid, China Southern Grid, TELD, Star Charge, CATL Qiji Energy (truck swap) |
| EPC and power engineering | MV design, substations, switchgear, civil works | Black & Veatch, Burns & McDonnell, Rosendin, Quanta Services | PowerChina, China Energy Engineering (CEEC), provincial grid design institutes |
| Charger hardware | DC cabinets and dispensers, MCS, AC pedestals | ABB E-mobility, Kempower, Alpitronic, Siemens (Heliox), Tesla, BTC Power, ChargePoint | TELD, Star Charge, XCharge, Huawei Digital Power, Infypower (modules) |
| Battery and microgrid | BESS, power conversion, microgrid controllers | Tesla Megapack, Fluence, FlexGen, Wartsila, Schneider Electric, Scale Microgrids | CATL, BYD, Sungrow, Hithium, NARI |
| Software | Charger management, EMS, fleet telematics | Ampcontrol, The Mobility House, EV Connect (Schneider), Geotab, Samsara | TELD and Star Charge platforms, Huawei FusionCharge |
Delivery models
Three ways a depot gets built
| Model | Who pays capital | Who carries the risk | Examples |
|---|---|---|---|
| Owner-operated | Fleet | Fleet: utilization, uptime, utility schedule | Amazon, UPS, FedEx, transit agencies |
| Charging as a service | Developer | Developer; fleet signs a long-term charging contract | Terawatt, Voltera, WattEV, Zeem |
| Utility or grid-company led | Utility make-ready or grid company | Ratepayers for the service; fleet or operator for chargers | California make-ready programs; State Grid depots in China |
Sector specialists
Ports, airports and mines need specialists
| Sector | Specialists | What changes |
|---|---|---|
| Ports and terminals | ABB, Cavotec, Kalmar, Konecranes, ZPMC (China) | Integration with terminal operating systems, shore power, automated equipment |
| Airports | Oshkosh AeroTech, TLD, ABB | Airside safety rules, ground support equipment duty cycles |
| Mines and plants | Epiroc, Sandvik, Caterpillar, Komatsu, Liebherr, ABB; XCMG and Sany (China) | Trolley assist, battery swap, tie-in to existing substations |
Sources
Sources and scope
- Scope
- Fleet Depot Builders and Integrators
- Sources
- Electrive (Terawatt financing, June 2026); company announcements; ElectronsX
- Updated
- October 2026